Collection at the door. Recovery at the plant. Nothing left over for the landfill.

We collect municipal solid waste from bulk waste generators only: housing societies, campuses, offices, hotels and institutions. Every load is segregated, weighed and processed at our own recovery facility, with zero waste sent to landfill.

A collection round you can set your watch by.

Scheduled pickups for your premises, with the four streams kept apart from the bin to our plant.

  • Daily or scheduled collection of wet, dry, sanitary and special-care waste
  • Colour-coded bins, signage and a short training for residents, staff and housekeeping teams
  • Our own vehicles and a trained crew, so segregated waste is never re-mixed in transit
  • A weight record for every pickup, logged against your premises
  • Monthly reports that support your SWM Rules 2026 filings

How we process what we collect

Everything we pick up goes to our own material recovery facility. Nothing is dumped, burned or sent to landfill.

Weighed in

Every load is weighed at our gate and matched to the pickup record from your premises.

Sorted by hand and machine

PET, HDPE, metal, paper and multilayer plastic are separated into clean, saleable fractions.

Wet waste treated

Organic waste goes to composting or biological treatment, not to a dump.

Zero to landfill

What recyclers won't buy becomes Plave pavers, GeoBlocks or refuse-derived fuel.

The residue is where most services fall short.

Recovering fractions that already have a buyer is the easy part. What's left, like multilayer wrappers, dirty film and mixed plastic, usually gets dumped or burned.

  • Non-recyclable plastic is shredded and pressed into Plave pavers
  • Construction debris goes into GeoBlocks precast
  • High-calorific residue is processed into refuse-derived fuel for energy recovery

The SWM Rules, 2026 and EBWGR

Notified by the Ministry of Environment, Forest and Climate Change on 28 January 2026 and in force from 1 April 2026, the new rules make bulk waste generators responsible for their waste beyond the gate.

Are you a bulk waste generator?

You are if you meet any one of these:

20,000 m²built-up area or more
40,000 Lwater use a day or more
100 kgwaste a day or more

Includes government offices, PSUs, institutions, commercial premises and residential societies.

  1. Segregate into four streamsWet, dry, sanitary and special care. Unsegregated waste attracts higher charges.
  2. Meet EBWGRExtended Bulk Waste Generator Responsibility: process wet waste on site where you can, or obtain EBWGR certificates from authorised processors.
  3. Register on the CPCB portalRegister with your local body through the centralised portal.
  4. File by 30 JuneAn annual return, including the EBWGR certificates procured. Non-compliance attracts environmental compensation.

Summary based on the Press Information Bureau release of 28 January 2026. For general information only, not legal advice. Refer to the notified rules and your state pollution control board.

What a bulk waste generator gets

One accountable partner

Collection, processing and paperwork under one contract.

Compliance, handled

Weight records and documentation that support your SWM Rules 2026 and EBWGR filings.

Premises-level reporting

Stream-wise tonnage and recovery for your site, every month.

A trained crew

Uniformed, equipped and trained to work in residential and office settings.

Zero landfill

Every kilo accounted for, and nothing sent to a dump.

Simple commercials

Pricing based on your volumes and pickup frequency.

Frequently asked questions

What does Dump In Bin's service for bulk waste generators include?

Segregated collection of wet, dry, sanitary and special-care waste from your premises, bins and training for residents or staff, processing at our own material recovery facility with zero landfill, and monthly weight records that support your SWM Rules 2026 and EBWGR compliance.

How do you process the collected waste?

Every load is weighed in at our material recovery facility and sorted into clean fractions for registered recyclers. Wet waste goes to composting or biological treatment. What recyclers won't take becomes Plave pavers, GeoBlocks or refuse-derived fuel. Nothing is dumped, burned in the open or sent to landfill, and every tonne is traceable from your gate to its final destination.

What are the Solid Waste Management Rules, 2026?

Rules notified by MoEFCC on 28 January 2026, replacing the 2016 rules from 1 April 2026. They require four-stream segregation at source, define bulk waste generators, introduce Extended Bulk Waste Generator Responsibility (EBWGR), and route registration and returns through a CPCB centralised portal.

What is EBWGR?

Extended Bulk Waste Generator Responsibility. Bulk waste generators must process wet waste on site where feasible, or obtain EBWGR certificates from authorised processors, and report them in an annual return filed by 30 June.

What happens to waste that can't be recycled?

Multilayer wrappers, dirty film and mixed plastic are shredded and used to make Plave, a 100% recycled paver. Construction debris goes into GeoBlocks, and high-calorific residue is processed into refuse-derived fuel.

How does Dump In Bin work ethically?

We run a zero-landfill facility kept to high standards of hygiene. Our workforce is driven largely by women. Every worker is paid a fair wage with PF and ESI, and gets protective equipment, training and regular health checks. Health and safety is part of how every shift is run, not an afterthought.

Running a society, campus or office that generates bulk waste? Let's set up your collection.

Get a collection plan