Weighed in
Every load is weighed at our gate and matched to the pickup record from your premises.
We collect municipal solid waste from bulk waste generators only: housing societies, campuses, offices, hotels and institutions. Every load is segregated, weighed and processed at our own recovery facility, with zero waste sent to landfill.
Scheduled pickups for your premises, with the four streams kept apart from the bin to our plant.
Everything we pick up goes to our own material recovery facility. Nothing is dumped, burned or sent to landfill.
Every load is weighed at our gate and matched to the pickup record from your premises.
PET, HDPE, metal, paper and multilayer plastic are separated into clean, saleable fractions.
Organic waste goes to composting or biological treatment, not to a dump.
What recyclers won't buy becomes Plave pavers, GeoBlocks or refuse-derived fuel.
Recovering fractions that already have a buyer is the easy part. What's left, like multilayer wrappers, dirty film and mixed plastic, usually gets dumped or burned.
Notified by the Ministry of Environment, Forest and Climate Change on 28 January 2026 and in force from 1 April 2026, the new rules make bulk waste generators responsible for their waste beyond the gate.
You are if you meet any one of these:
Includes government offices, PSUs, institutions, commercial premises and residential societies.
Summary based on the Press Information Bureau release of 28 January 2026. For general information only, not legal advice. Refer to the notified rules and your state pollution control board.
Collection, processing and paperwork under one contract.
Weight records and documentation that support your SWM Rules 2026 and EBWGR filings.
Stream-wise tonnage and recovery for your site, every month.
Uniformed, equipped and trained to work in residential and office settings.
Every kilo accounted for, and nothing sent to a dump.
Pricing based on your volumes and pickup frequency.
Segregated collection of wet, dry, sanitary and special-care waste from your premises, bins and training for residents or staff, processing at our own material recovery facility with zero landfill, and monthly weight records that support your SWM Rules 2026 and EBWGR compliance.
Every load is weighed in at our material recovery facility and sorted into clean fractions for registered recyclers. Wet waste goes to composting or biological treatment. What recyclers won't take becomes Plave pavers, GeoBlocks or refuse-derived fuel. Nothing is dumped, burned in the open or sent to landfill, and every tonne is traceable from your gate to its final destination.
Rules notified by MoEFCC on 28 January 2026, replacing the 2016 rules from 1 April 2026. They require four-stream segregation at source, define bulk waste generators, introduce Extended Bulk Waste Generator Responsibility (EBWGR), and route registration and returns through a CPCB centralised portal.
Extended Bulk Waste Generator Responsibility. Bulk waste generators must process wet waste on site where feasible, or obtain EBWGR certificates from authorised processors, and report them in an annual return filed by 30 June.
Multilayer wrappers, dirty film and mixed plastic are shredded and used to make Plave, a 100% recycled paver. Construction debris goes into GeoBlocks, and high-calorific residue is processed into refuse-derived fuel.
We run a zero-landfill facility kept to high standards of hygiene. Our workforce is driven largely by women. Every worker is paid a fair wage with PF and ESI, and gets protective equipment, training and regular health checks. Health and safety is part of how every shift is run, not an afterthought.